Rajashree Construction Consortium

1
1 Excavation for Side To Side Phase(1&2)
2 Excavation for Side To Side Phase(4)
3 Excavation for Soil Side To Side Phase(3&4)
4 Excavation for soil out side shifting Phase (3)
5 Excavation for soil out side shifting.
2
1 Excavation for soil out side shifting Phase (3)
3
1 Excavation for Hard Rock Phase(3)
2 Excavation for Soil Back filling Phase(4)
4
1 Excavation for DG Stack footing Phase(3)
5
1 Excavation for Soil Out side shiffting (UG tank area in Phase(3)
2 Excavation for Hard Rock Out side shiffting (area F1 Phase(4)
3 Bill for Excavation Back Filling(F/C 37-A)
4 JCB