Setu Constructions

1
1 Excavation for soil out side shifting
2
1 Removing of debris from site with truck & disposal at the dumping yard designed by Govt. Authorities.
3
1 Filling and Leveling
4
1 Excavation for Muroom Out Side shifting.
5
1 Excavation for Soil Out Side shifting.( Phase 4 & 5 )
6
1 SOIL BACK FILLING (20.4.2022)
2 MURAM SHIFED (SITE TO SITE)(28.05.2022)
3 SOIL BACK FILLING (29.05.2022)
4 MURAM SHIFED (SITE TO SITE)(01.06.2022)
5 SOIL SHIFED (SITE TO SITE)(09.6.2022)
6 SOIL SHIFED (SITE TO SITE)(16.06.2022)
7 SOIL SHIFED (SITE TO SITE)(17.06.2022)
8 SOIL SHIFED (SITE TO SITE)(18.06.2022)
7
1 Excavation Soil outside to inSide Shifting Building Area.
8
1 Soil Out Side shifting. ( Phase 4 & 5 )
2 Soil PER DAY DAMPER (trip/brass)
3 Soil Side to Side Shifting.
4 Soil Side to Side Shifting.
5 Soil Outside to InSide Shifting.
6 Soil Outside to InSide Shifting.
7 POKLEN
8 JCB
9
1 Excavation Soil outside to inSide
1 0
1 Excavation Rock
2 Excavation Soil & RA02 ROCK
3 Excavation OF Soil Side to side Shifting (DG Platform (F to H)
4 Excavation OF Soil Back Filling.
5 Excavation Soil Outside Shifting.
6 Excavation Soil Outside to InSide Shifting
7 DEBRIS
8 JCB
9 POKLEN BUCKET
9 POKLEN Braker
1 1
1 Excavation Of Soil
1 Excavation Of RA02 ROCK
1 2
1 Excavation Of Hard ROCK